Steve fitted marble-effect shower wall panels at a customer's home in Ryde, with the existing shower enclosure retained. The customer then asked Steve to fit the bathroom flooring too, and the job is now complete. These real job photos show the original shower, Steve at work, the flooring being fitted and the completed bathroom with its new grey wood-effect floor.
The problem
The customer wanted a shower wall-panel upgrade in Ryde while retaining the existing enclosure, and then asked Steve to fit the bathroom flooring too.
Work carried out
Fitted marble-effect shower wall panels at a customer's home in Ryde.
Retained the customer's existing shower enclosure.
Fitted grey wood-effect bathroom flooring at the customer's request.
The photo sequence documents the original tiled shower, Steve at work, the flooring installation and the completed bathroom.
The recorded outcome
The job is now complete: the shower has marble-effect wall panels, with the existing enclosure retained, and the bathroom has new grey wood-effect flooring. The before, during and after photos show both parts of the upgrade.
Photos from this job
Before: Original blue-tiled shower before the wall-panel upgrade, with the existing enclosureDuring: Steve working inside the shower enclosure during a shower-panel fitting job in RydeDuring: Close-up of Steve working on the Ryde shower-panel installationDuring: Marble-effect shower wall panels around the shower controls during installationDuring: Wider view of the shower enclosure and wall panels while the Ryde job was in progressDuring: Bathroom flooring being fitted around the retained shower enclosure in RydeDuring: Grey wood-effect flooring being measured and fitted during the bathroom upgradeAfter: Finished marble-effect shower panels with the existing enclosure retained, viewed with the door openAfter: Wider bathroom view of the completed shower-panel upgrade in RydeAfter: Completed marble-effect wall panels behind the retained shower enclosureAfter: Completed grey wood-effect bathroom flooring viewed from the doorwayAfter: New bathroom flooring fitted around the existing basin and toiletAfter: Completed Ryde shower-panel and bathroom-flooring job with the existing shower enclosure retained