Wetroom Waste Collapse — New Tray & Screen — PO35
Job location: PO35
The wetroom waste had collapsed and there was no way to get below the floor to carry out a repair — the construction made access impossible. Rather than hack up a concrete or tanked floor, Steve fitted a new shower tray directly on top of the existing wetroom flooring, connected it to the waste, and added a new glass screen enclosure. Problem solved the same day without any major floor work.
The problem
A collapsed wetroom waste could not be reached from beneath the floor.
Work carried out
- Fitted a new tray directly over the existing wetroom flooring and connected it to the waste.
- Added a glass screen enclosure.
The recorded outcome
The problem was resolved the same day without major floor work.
Photos from this job